86.4 F
Basseterre

Roadwork in Full Swing Near Sugar Factory Road, Basseterre

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – The Roads and Drains Division of the Public Works Department (PWD) in the Ministry of Public Infrastructure, Energy & Utilities, and Domestic Transport will ease the commute of residents and transients near Sugar Factory Road and the George Moody Stuart School in Basseterre.

MoPIEUDT NEWS visited the site on Friday morning (December 12, 2025) and saw the asphalt and concrete crew undertaking the joint effort to give the road and drains a much-needed facelift.

One resident recalled how the potholes added discomfort to her travels and stated how thankful she was that that road was being fixed.

A commuter expressed gratitude that she would no longer have to swerve her car around potholes while commuting through the area.

The activity is part of PWD’s continuous efforts to improve the infrastructure around the island.

PWD Web Page

To learn more about the activities of the Public Works Department, visit https://mopieudt.gov.kn/the-public-works-department and follow the PWD on Facebook.

Related articles

Public Works Department Begins Road Rehabilitation Works in Suncrest

Basseterre, Saint Kitts (Public Infrastructure News) – On Thursday, May 14, 2026, the Roads and Drains Division within...

Road Works in Suncrest, Bird Rock to Begin May 13, 2026.

Basseterre, St. Kitts (Public Infrastructure News) - The Ministry of Public Infrastructure, Energy and Utilities, through the Roads...

See PWD’s Roadwork Schedule for May 6, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – The Roads and Drains Division within the Public Works Department (PWD) will...

See PWD’s Roadwork Schedule for May 5, 2026

Basseterre, Saint Kitts (Public Infrastructure News) - Officials in the Roads and Drains Division of the Public Works...
Call Now Button